Peace, warmth and comfort in your home – AZ Grand Solutions

New bathroom on the second floor in Utrecht

In a home in Utrecht we built a complete bathroom on the second floor, in a room that was not a bathroom before. From the first wall to handover the work took 5 days.

  • Location: Utrecht
  • Work: New bathroom built from scratch
  • Duration: 5 days
New bathroom with a walk-in shower, wall-hung toilet and vanity unit

The situation

The house has a ground floor and two upper floors. On the top floor, next to the bedroom, there was an empty room without a fixed purpose. A complete bathroom had to be built there.

What we did

  1. Built a new wall with metal studs and insulation, including a concealed cistern for the wall-hung toilet.
  2. Installed water pipes and drains to the new bathroom.
  3. Applied a waterproof layer on the floor, with a shower drain for the walk-in shower.
  4. Tiled walls and floor, with two niches in the shower wall.
  5. Fitted a walk-in shower with glass screen, rain shower and thermostatic mixer.
  6. Installed the wall-hung toilet and a vanity unit with basin and tap.

Photos of the work

Wall frame with insulation and a concealed cistern for a wall-hung toilet
Waterproof layer on a bathroom floor with a linear shower drain
Tiled shower area with niches and a linear shower drain
Linear shower drain with a tiled edge in a walk-in shower
Vanity unit with a basin and tap
New bathroom with a walk-in shower, wall-hung toilet and vanity unit
Walk-in shower with a glass screen beside a wall-hung toilet

The result

A complete bathroom with walk-in shower, wall-hung toilet and vanity unit, right next to the bedroom. On complete projects you get up to 5 years’ warranty.

More about this work

Bathroom renovation · Plumbing

CallWhatsAppQuote